This post and photography comes courtesy of club member Casey, owner of the four barrels we’re using for the barrel project phase two. Enjoy! — Grant
————————————–
We spent a little time at Aaron’s house yesterday building the Barrel Racks. I pretty much stood around and watched – we definitely had the right two guys doing the actual “build.” Tim and Aaron have some skills that I just don’t possess…so I let them do their thang! Every good build starts with a good drawing. Maybe Tim will sign this drawing and we can auction it off one day:
Teamwork. This is how shit gets done:
Measure twice, cut once…unless you’re Tim. Eyeball that shit and it comes out perfect. A former cabinet maker is the guy you want on your team.
Things were really starting to come together….
…until Nick showed up and derailed production with a Surly Darkness Vertical tasting (thanks Nick!).
The afternoon quickly devolved into more drinking and less building (and even less photography).
A most excellent way to cap a partial rack building project. Next up: installing the casters and filling the barrels with water to swell them / ensure they’re sealed.
Thanks Aaron and Tim for your hard work, and Nick for a Menards run and stellar beers.
-C